PAI-SF / 10 / PAI-SF-TST-001

Hardware-in-the-Loop Pre-Deployment Testing

Objective

Ensure safety-critical behaviors undergo HITL testing before deployment and after significant changes.

Control / requirement

HITL testing includes actual deployment hardware; covers safety-critical behaviors from hazard analysis, boundary conditions, and sim-to-real-transfer- challenging scenarios; repeated after significant changes.

Applicability

Systems where simulation-trained or simulation- validated behavior has physical safety implications.

Expected evidence

HITL test platform documentation; test scenario specifications traced to hazard analysis; test execution records; sim-to-real gap analysis. [T2/T3]

Assurance expectation

Test coverage analysis demonstrating safety-critical behaviors are tested in HITL configuration, not only simulation.

Dependencies

PAI-SF-SAF-001 (safe-state behaviors are test priorities).

Exclusions

For systems with negligible physical consequence, simulation-only validation may be proportionally acceptable.

Maturity / conformance relevance

Expected at Operational and High-Assurance levels; Foundational expects a documented testing strategy at minimum.

Ecosystem relationship

Extends GAISSF™ testing controls to physical hardware validation; informs AI-IRF™ post-incident revalidation.

Domain

Domain 10. Simulation, Testing, and Validation

Download full Control Catalogue ↓