PAI-SF / 8 / PAI-SF-IRP-003

Hardware-in-the-Loop Revalidation Before Return-to-Service

Objective

Ensure systems involved in an incident undergo physical HITL revalidation, not merely software review, before returning to operation.

Control / requirement

Mandatory HITL test pass tied to root-cause-specific scenarios before reactivation.

Applicability

Any physical AI system involved in an incident requiring containment or recovery.

Expected evidence

Revalidation test records; root-cause traceability. [T2/T3]

Assurance expectation

Evidence that revalidation scenarios specifically target the identified root cause, not a generic pre-deployment test suite.

Dependencies

PAI-SF-TST-001 (Domain 10, HITL testing methodology) — same testing capability, incident-driven trigger and scope here rather than pre-deployment.

Exclusions

Not applicable to incidents with no plausible physical root cause (e.g., purely administrative/governance incidents).

Maturity / conformance relevance

Expected at all conformance levels.

Ecosystem relationship

The physical-return-to-service requirement AI-IRF™ does not specify on its own — PAI-SF™'s core addition to incident recovery.

Domain

9. Supply Chain and Update Assurance

Download full Control Catalogue ↓